Hub ProInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Tullamarine VIC 3043, Australia
Operational
Fully operational facility
Operated by:

Microsoft: MEL07

Short Code: MEL07
Year Built: 2025
Floors: 2
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Map and Nearby Locations

This Facility
Microsoft Azure Sites
Nearby Facilities

Prime HubInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of PrimeInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
NN milesInterested in this information?Contact us Carrier-Neutral Data CenterInterested in this information?Contact us
Vantage plans to build a second data center campus in Melbourne, Australia.
NN milesInterested in this information?Contact us NEXTDC: M2 Melbourne Tullamarine
M2 Melbourne is a Tier IV certified data centre situated in Tullamarine, conveniently located near major transport and telecommunications infrastructure.
NN milesInterested in this information?Contact us Vantage Melbourne MEL1
Vantage is building one multi-story data center on its MEL1 site in Tullamarine, Melbourne.
NN milesInterested in this information?Contact us AirTrunk: Melbourne MEL2
Leading APAC data center developer AirTrunk has finalized the acquisition of a new site in Melbourne for its second regional campus, MEL2.
NN milesInterested in this information?Contact us AirTrunk: MEL2 Expansion
NN milesInterested in this information?Contact us Zerra DC: Melbourne Campus
Zerra DC has filed a planning permit application with the state of Victoria to develop a six-building data center campus in Campbellfield, north of Melbourne, Australia.
NN milesInterested in this information?Contact us Centuria: Thomastown Keon Park
Thomastown and Keon Park is CIP’s largest data centre conversion site, a 10.6 hectare industrial holding about 17 km north of Melbourne’s CBD and less than 100 metres from the Thomastown terminal station.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate control, networking, server racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud provider, Azure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the world, with plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete market, typically containing two or more regions, that preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent power, cooling, and networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

0
Facilities
0
Markets

News See all

Read Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine
Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected tax...

Microsoft Trims Mount Pleasant Data Center Plan To Seven Buildings From Nine

October 12, 2026 Microsoft Azure

Microsoft has cut the number of buildings planned for the 791-acre Durand Avenue portion of its Mount Pleasant, Wisconsin, data center campus to seven from nine, reducing the parcel's projected taxable value by about 24 percent, or nearly $1.9 billion, the Milwaukee Business Journal reported on...

Read more
Read HyperDC Files Plans for 400MW Data Center Campus West of Melbourne
HyperDC Pty Ltd has filed a planning permit application for a 400MW data center campus at 715 Ballan Road in Moorabool, about 75 kilometres west of [Melbourne](https://baxtel.com/regions/melbourne)...

HyperDC Files Plans for 400MW Data Center Campus West of Melbourne

September 29, 2026 Melbourne

HyperDC Pty Ltd has filed a planning permit application for a 400MW data center campus at 715 Ballan Road in Moorabool, about 75 kilometres west of Melbourne, as reported by Data Center Dynamics. The developer's website lists the 39-hectare parcel as MBL1 and states an intention to build 400MW of...

Read more
Read Microsoft Plans 38GW Of Data Center Capacity By 2032
Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with le...

Microsoft Plans 38GW Of Data Center Capacity By 2032

September 11, 2026 Microsoft Azure

Microsoft plans to more than triple its data center capacity over the next five years, targeting 38GW by 2032, up from its current 12GW. The capacity will combine Microsoft-owned facilities with leased capacity from third-party providers, including neoclouds such as CoreWeave, Nscale, Lambda,...

Read more
Read Former Microsoft Researcher Launches Data Center Robotics Startup
Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderfu...

Former Microsoft Researcher Launches Data Center Robotics Startup

August 04, 2026 Microsoft Azure

Swiss startup Exclaim Robotics, founded by a former Microsoft engineer, has raised $4.95 million in pre-seed funding to develop autonomous robots for AI data center maintenance. Backed by Founderful and Playfair, the company aims to automate remote hands tasks such as cleaning optics,...

Read more
Read Microsoft Secures Capacity At Pure DC Data Center In Finland
Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW...

Microsoft Secures Capacity At Pure DC Data Center In Finland

July 14, 2026 Microsoft Azure

Pure DC has launched the first phase of its Seinäjoki, Finland, data center project, with Microsoft reportedly among the customers leasing capacity at the site. The initial phase will deliver 110MW of capacity with an estimated investment of $1.7 billion. Pure DC has been developing plans for the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?