GammaInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Temple, TX
Operational
Fully operational facility
Operated by:

Meta: Temple TX

Year Built: 2026
Lot Size: 393 acres
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Meta’s $1.2 billion data center in Temple, Texas, is now operational and serving live traffic, representing the company's first facility featuring its new AI-optimized architecture.

Located on 393 acres, the 900,000-square-foot site began construction in spring 2022, paused briefly in late 2022 to redesign the layout for artificial intelligence workloads, and resumed work in October 2023.

Meta's second location in Texas alongside its Fort Worth facility, the Temple site supports 100 operational jobs, matches 100% of its electricity use with clean energy via a 240MW solar agreement, and uses a closed-loop liquid cooling system that operates without consuming water for most of the year.

Map and Nearby Locations

This Facility
Meta Sites
Nearby Facilities

Point ThreeInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cloud PointInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Real Estate Data CenterInterested in this information?Contact us
Oppidan, a US real estate firm, is constructing a 61,554-square-foot data center in Temple, Texas. The $31 million project, slated to become operational in October 2026.
NN milesInterested in this information?Contact us Connect: Temple 2
Oppidan, a US real estate firm, is constructing a 172,380-square-foot data center in Temple, Texas.
NN milesInterested in this information?Contact us Rowan: AUS01
Rowan Digital Infrastructure has officially commenced construction on its hyperscale data center campus, known as "Project Temple," in Temple, Texas.
NN milesInterested in this information?Contact us Rowan: AUS02
The $780 million AUS02 project will see the construction of a single-story building totaling 500,000 sq ft (46,451 sqm).
NN milesInterested in this information?Contact us Rowan: AUS03
AUS03 is part of Rowan Infrastructure's Project Temple in Texas.
NN milesInterested in this information?Contact us Rowan: Moriah DC
Originally announced in 2021, Rowan’s Moriah Data Center in Temple’s Synergy Park was completed in 2023. After the tenant vacated the property in 2024, Rowan shifted plans to convert the facility into a warehouse.

Operating Company

Operated by:

Founded in 2004, Facebook needs no introduction as the world's largest social network. All the status updates, family photos and videos add up and create a need for a massive amount of storage and compute. Facebook maintains a growing stable of data centers spread across the world.

0
Facilities
0
Markets

News See all

Read Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus
The first data center building at the 2,842-acre Cedar Creek campus being developed by [Pacifico Energy](https://baxtel.com/data-centers/pacifico-energy) and [BlackChamber Group](https://baxtel.com...

Project Longhorn Files $366M First Building at Anthropic-Linked Texas Campus

October 11, 2026 Pacifico Energy

The first data center building at the 2,842-acre Cedar Creek campus being developed by Pacifico Energy and BlackChamber Group is on file with the Texas Department of Licensing and Regulation. The October 7 filing, reported by Community Impact, outlines a $366 million building at the Bastrop...

Read more
Read Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia
[Meta](https://baxtel.com/data-centers/meta) has signed strategic AI infrastructure agreements with Australian AI factory developer [Firmus Technologies](https://baxtel.com/data-centers/firmus-tech...

Meta Signs for GPU Capacity at Firmus AI Factories in Southeast Asia

September 30, 2026 Firmus Technologies

Meta has signed strategic AI infrastructure agreements with Australian AI factory developer Firmus Technologies for GPU compute capacity at Firmus sites across Southeast Asia, the companies announced Tuesday. The agreements cover contracted capacity plus options to expand, and Capital Brief...

Read more
Read Meta Signs Deal to Use AI Capacity at Firmus Data Centers in Southeast Asia
Meta has agreed to lease AI compute capacity from Australian neocloud Firmus across its upcoming Southeast Asian data centers. The deal expands an existing partnership under which Meta leases Nvidi...

Meta Signs Deal to Use AI Capacity at Firmus Data Centers in Southeast Asia

September 30, 2026 Meta

Meta has agreed to lease AI compute capacity from Australian neocloud Firmus across its upcoming Southeast Asian data centers. The deal expands an existing partnership under which Meta leases Nvidia GB300 NVL72 capacity at Firmus’ Melbourne facility. Firmus is developing AI factories with DayOne...

Read more
Read Meta’s $1.2B Data Center In Kuna, Idaho, Goes Live
Meta’s Kuna, Idaho Data Center Is Now Operational Meta has begun serving traffic from its data center in Kuna, Idaho. The company announced the campus in 2022, initially planning to invest $800 mil...

Meta’s $1.2B Data Center In Kuna, Idaho, Goes Live

September 04, 2026 Meta

Meta’s Kuna, Idaho Data Center Is Now Operational Meta has begun serving traffic from its data center in Kuna, Idaho. The company announced the campus in 2022, initially planning to invest $800 million in a 960,000 sq ft (89,187 sqm) facility. The project was later temporarily paused for redesign...

Read more
Read Meta Expands Louisiana Data Center Campus To 5GW
Meta plans to more than double its Richland Parish, Louisiana, data center campus to 5GW of capacity. The site, known as the Hyperion data center project, was previously planned as a 2GW developmen...

Meta Expands Louisiana Data Center Campus To 5GW

July 13, 2026 Meta

Meta plans to more than double its Richland Parish, Louisiana, data center campus to 5GW of capacity. The site, known as the Hyperion data center project, was previously planned as a 2GW development. Announced in late 2024, Hyperion was originally designed as a 4 million sq ft (372,000 sqm)...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?