Latest Podcast Street AddressInterested in this information?Contact us, Grays, UK
Planned
Future facility in planning stage
Operated by:

Google: Purfleet

Lot Size: 129 acres

Google has acquired a plot of land in Essex, UK, previously used as a racetrack and earmarked for residential developments. The 129 acres, located on Arterial Road in Purfleet, was sold to Global Infrastructure UK Limited for £47 million ($57.3m) in a deal completed in July 2023. LSL sold it to tech giant google in late 2023.
The land was previously used as the Arena Essex Raceway; a stock car and speedway racing track that opened in 1978 and closed in 2018.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of Ridge GammaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Fujitsu: London East (SDC01)
The Fujitsu London East (SDC01) data center is a Tier III certified facility located in Grays, Essex.
NN milesInterested in this information?Contact us Custodian Dartford DA2
Custodian Data Centres' Dartford DA2 is a purpose-built, carrier-neutral colocation facility on the M25 edge of London, opened in 2022 as the operator's growth site beyond its original Maidstone home. Custodian designed, built and operates the site with its in-house engineering team, using cold-aisle containment to run at a PUE of 1.25 to 1.3 from commissioning. It offers private suites, dedicated halls and shared colocation, with white space held back for bespoke high-density builds.
NN milesInterested in this information?Contact us Digital Reef: East Havering Campus
Digital Reef aims to construct a massive $5.97 billion (£5.3 billion) data center campus on a 175-acre Green Belt site in London's Havering borough.
NN milesInterested in this information?Contact us OVH London LON-1
The OVH site of the new London facility was previously owned by a telecoms operator and it is near two substations, providing the required high electrical capacity
NN milesInterested in this information?Contact us Stratus: Belvedere
Stratus Data Centres plans to construct two Tier III data centers in Belvedere, South East London.
NN milesInterested in this information?Contact us Clearstone Energy: Ebbsfleet Campus
UK developer Clearstone Energy has proposed the Ebbsfleet AI Data Centre Campus on 145 acres near Dartford, Kent.
NN milesInterested in this information?Contact us NTT London 1 (Dagenham)
The NTT LON1 facility will be 24,000 sqm and 60MW critical IT load once fully developed.
NN milesInterested in this information?Contact us Clearstone Energy: East London Campus
Clearstone Energy is planning to develop the East London Data Centre Campus, a major facility planned on over 100 acres east of London in partnership with an established data center investor and operator.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing
Finnish regulators have ordered a halt to work at two planned [Google](https://baxtel.com/data-centers/google) data centers after more than 300 hectares of forest were cleared before mandatory envi...

Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing

October 10, 2026 Google

Finnish regulators have ordered a halt to work at two planned Google data centers after more than 300 hectares of forest were cleared before mandatory environmental impact assessments were completed, the BBC reported. The order covers the company's project sites in Muhos and Kajaani, both in the...

Read more
Read Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance
Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and...

Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance

October 08, 2026 Google

Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and Supervision Agency has requested reports from local authorities and project manager Tuike Finland...

Read more
Read Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM
[Google](https://baxtel.com/data-centers/google) will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interco...

Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM

October 07, 2026 Google

Google will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interconnection, the companies announced on Oct. 6. Constellation will spend more than $4.3 billion upgrading reactors in Illinois, Pennsylvania and...

Read more
Read Google’s Global Data Center Design and Construction Head Joins Anthropic
Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google.

...

Google’s Global Data Center Design and Construction Head Joins Anthropic

October 05, 2026 Google

Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google. "Leading global infrastructure delivery across data centers and subsea programs taught me two enduring...

Read more
Read Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link
Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company [said on Sept. 28](https://www.crusoe.ai/resources/newsroom/crusoe-developing-d...

Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link

October 01, 2026 Crusoe

Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company said on Sept. 28. The site sits outside Amarillo, and it pairs with 531 megawatts of adjacent West Texas wind, a design that puts generation rather than land at the center of the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?