SouthInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Van Buren Township, MI 48111, USA
PlannedProspective Expansion
Future facility in planning stagefacility with prospective expansion planned
Operated by:

Google: Project Cannoli

Year Planned: 2028
Utility Provider: DTE Energy
Ownership: Google owns the building.
Lot Size: 282 acres

The planned hyperscale campus in Van Buren Township is being developed by Panattoni and has been identified as a Google project, following its earlier codename “Project Cannoli.” The ~280-acre site is designed to support up to 1GW of capacity, making it one of the largest proposed data center developments in the Midwest. Power for the facility will be supplied by DTE Energy under a long-term agreement that includes significant new clean energy generation and grid infrastructure.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Central ParkInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of South CampusInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Panattoni: Detroit, Michigan
Panattoni’s "Project Cannoli" in Van Buren Township is a massive data center development planned for 282 acres between Haggerty and Hannan roads.
NN milesInterested in this information?Contact us Panattoni: Detroit Expansion
Panattoni’s "Project Cannoli" in Van Buren Township is a massive data center development planned for 282 acres between Haggerty and Hannan roads.
NN milesInterested in this information?Contact us US Signal: MI03 Bldg3
US Signal is planning a 27,500-square-foot Phase IV, bringing the total MI03 Campus footprint to 87,500 square feet.
NN milesInterested in this information?Contact us US Signal: MI03 Bldg1
US Signal currently operates a 25,000-square-foot facility on a 7.91-acre site in Van Buren.
NN milesInterested in this information?Contact us US Signal: MI03 Bldg2
US Signal's Phase II/III addition at its MI03 campus in Belleville, Michigan, about 10 miles from Detroit Metropolitan Airport. The 35,000-square-foot build is designed for liquid-cooled high-density deployment, with chillers and the water loop in the base scope and the tenant fitting out from a PDU/CDU demarcation point.
NN milesInterested in this information?Contact us Education Data CenterInterested in this information?Contact us
The planned University of Michigan–Los Alamos “Michigan-SPARC” supercomputing campus, remains officially on the books but its future is increasingly uncertain.
NN milesInterested in this information?Contact us Online Tech Westland
NN milesInterested in this information?Contact us Solstice Data: Allen Park, MI
The proposed Solstice Data center in Allen Park is an "edge" facility designed to support low-latency AI applications for local industries like healthcare and automotive manufacturing.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing
Finnish regulators have ordered a halt to work at two planned [Google](https://baxtel.com/data-centers/google) data centers after more than 300 hectares of forest were cleared before mandatory envi...

Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing

October 10, 2026 Google

Finnish regulators have ordered a halt to work at two planned Google data centers after more than 300 hectares of forest were cleared before mandatory environmental impact assessments were completed, the BBC reported. The order covers the company's project sites in Muhos and Kajaani, both in the...

Read more
Read Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance
Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and...

Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance

October 08, 2026 Google

Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and Supervision Agency has requested reports from local authorities and project manager Tuike Finland...

Read more
Read Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM
[Google](https://baxtel.com/data-centers/google) will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interco...

Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM

October 07, 2026 Google

Google will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interconnection, the companies announced on Oct. 6. Constellation will spend more than $4.3 billion upgrading reactors in Illinois, Pennsylvania and...

Read more
Read Google’s Global Data Center Design and Construction Head Joins Anthropic
Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google.

...

Google’s Global Data Center Design and Construction Head Joins Anthropic

October 05, 2026 Google

Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google. "Leading global infrastructure delivery across data centers and subsea programs taught me two enduring...

Read more
Read Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link
Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company [said on Sept. 28](https://www.crusoe.ai/resources/newsroom/crusoe-developing-d...

Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link

October 01, 2026 Crusoe

Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company said on Sept. 28. The site sits outside Amarillo, and it pairs with 531 megawatts of adjacent West Texas wind, a design that puts generation rather than land at the center of the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?