Operational
Fully operational facility
Operated by:

Google: Grange Castle 2

Site: Campus PrimeInterested in this information?Contact us
Short Code: Building 2
Year Built: 2020
░░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Google's second data center in Dublin is located at Google's Profile Park data center campus in Grange Castle. Located on 11 acres of land, the two-storey data center with a three-storey office block spans a gross floor area of 35,426 sqm.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

WestInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Hub GammaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us CyrusOne : DUB I Bldg 2
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
NN milesInterested in this information?Contact us CyrusOne : DUB I Bldg 3
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
NN milesInterested in this information?Contact us Cloud CampusInterested in this information?Contact us
In June 2024, Google submitted a planning application to build a 72,400 sqm (779,310 sq ft) data center on a 50-acre site adjacent to its existing two facilities at Grange Castle Business Park in South Dublin.
NN milesInterested in this information?Contact us Metro ParkInterested in this information?Contact us
Google opened its first Irish data center in Dublin at Profile Park, Grange Castle in 2012.
NN milesInterested in this information?Contact us CyrusOne Dublin I
Strategically located in Dublin, one of Europe’s premier data centre locations, CyrusOne DUB1 campus will ultimately deliver 360,000 sq ft) of technical space in three separate buildings of two storeys.
NN milesInterested in this information?Contact us East CampusInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
NN milesInterested in this information?Contact us North TowerInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.
NN milesInterested in this information?Contact us Point AlphaInterested in this information?Contact us
Amazon is building a campus with three two-storey data centers (Buildings A, B, and C) with mezzanine floors at each level, having a gross floor area of 78,871 sqm.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing
Finnish regulators have ordered a halt to work at two planned [Google](https://baxtel.com/data-centers/google) data centers after more than 300 hectares of forest were cleared before mandatory envi...

Finland Halts Two Google Data Center Builds Over 300-Hectare Forest Clearing

October 10, 2026 Google

Finnish regulators have ordered a halt to work at two planned Google data centers after more than 300 hectares of forest were cleared before mandatory environmental impact assessments were completed, the BBC reported. The order covers the company's project sites in Muhos and Kajaani, both in the...

Read more
Read Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance
Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and...

Google’s €13bn Finland Data Center Expansion Investigated Over Forest Clearance

October 08, 2026 Google

Google’s planned data centers in Finland are under investigation after around 300 hectares of forest were reportedly cleared before environmental assessments were completed. Finland’s Licensing and Supervision Agency has requested reports from local authorities and project manager Tuike Finland...

Read more
Read Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM
[Google](https://baxtel.com/data-centers/google) will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interco...

Google Signs 20-Year Nuclear PPA With Constellation For 890MW In PJM

October 07, 2026 Google

Google will buy 890 MW of new nuclear output from Constellation Energy under a 20-year power purchase agreement covering 11 reactors across the PJM Interconnection, the companies announced on Oct. 6. Constellation will spend more than $4.3 billion upgrading reactors in Illinois, Pennsylvania and...

Read more
Read Google’s Global Data Center Design and Construction Head Joins Anthropic
Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google.

...

Google’s Global Data Center Design and Construction Head Joins Anthropic

October 05, 2026 Google

Google’s former head of global data center design and construction, John M. Wilson, has joined Anthropic as a member of technical staff, leading EMEA capacity delivery after six years at Google. "Leading global infrastructure delivery across data centers and subsea programs taught me two enduring...

Read more
Read Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link
Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company [said on Sept. 28](https://www.crusoe.ai/resources/newsroom/crusoe-developing-d...

Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link

October 01, 2026 Crusoe

Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company said on Sept. 28. The site sits outside Amarillo, and it pairs with 531 megawatts of adjacent West Texas wind, a design that puts generation rather than land at the center of the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?