Hub AlphaInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Varennes, QC J3X 1P7, Canada
Operational
Fully operational facility
Operated by:

Amazon YUL55

Year Built: 2018
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

aws zone: ca-central-1

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

StationInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Point AlphaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us eStruxture Montreal MTL3
eStruxture acquired this site in February 2018. It was previously known as Kolotek Boucherville
NN milesInterested in this information?Contact us Cologix MTL10-S
COLO-D2, located in Longueuil, offers a floor space of more than 180,000 sqft with a capacity of over 35 megawatts. Located less than 10 km from downtown Montreal
NN milesInterested in this information?Contact us Cologix Saint-Bruno-de-Montarville (Colo-D3 Proposed)
Canadian colocation firm Colo-D planned to build a 150MW, 500,000 square foot (46,500 sq m) data center campus in Saint-Bruno-de-Montarville (D3), 15km away from downtown Montreal. However this project never was completed with the acquisition by Cologix
NN milesInterested in this information?Contact us Cologix MTL4
Cologix offers secure Montréal data centre and colocation services in the purpose-built facility at 2341 Alfred Nobel
NN milesInterested in this information?Contact us Beanfield Montreal (Openface)
With proximity to ample hydroelectricity, the site has 750kW of reliable power onsite, redundant N+1 power availability 208VAC or 120VAC in 15A, 20A, 30A & 60A multiples in both single or 3-phase configurations. The site was previously known at Openface Montreal before being acquired by Beanfield in February 2020.
NN milesInterested in this information?Contact us eStruxture Montreal MTL1
Netelligent Hosting Services originally built the site in 2013 with an initial 12,000 sqft. In 2015 the site expanded by an additional 10,000 sqft for a total of 22,000sqft. eStruxture acquired Netelligent in 2017.
NN milesInterested in this information?Contact us eStruxture MTL-5
NN milesInterested in this information?Contact us Cologix MTL1
The site was previously owned by Canix

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus
Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land D...

AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus

October 07, 2026 Amazon AWS

Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land Development Plan with the Indiana County planning commission on August 28 under the project name...

Read more
Read AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania
Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussin...

AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania

October 07, 2026 Amazon AWS

Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussing potential development with Homer City Redevelopment. The proposed campus will span 1,100 acres...

Read more
Read AWS Receives Planning Approval for Data Center in Iver, UK
Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industri...

AWS Receives Planning Approval for Data Center in Iver, UK

October 01, 2026 Amazon AWS

Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industrial and warehouse units with a data center featuring 27 backup generators. Planning officers...

Read more
Read Generac Secures $8bn Backup Generator Deal With Amazon
Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. ...

Generac Secures $8bn Backup Generator Deal With Amazon

September 26, 2026 Amazon AWS

Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. Amazon will also have the option to buy nearly 1.7 million Generac shares. “It provides visibility...

Read more
Read Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio
Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joi...

Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio

September 21, 2026 Amazon AWS

Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joint venture between Rio Tinto and Alcoa. Its smelting process uses proprietary inert anodes instead...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?