East TowerInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Level 4 Singapore 627753
Operational
Fully operational facility
Operated by:

Amazon SIN2

Year Built: 2010
This site is leased from Equinix in the Equinix Singapore SG2 building
░░░ Request Dataset MW
Operational Power

Map and Nearby Locations

This Facility
Amazon AWS Sites
Nearby Facilities

Hub TwoInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Tower BetaInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us Equinix Singapore SG2
SG2 facility at Pioneer Walk is home to Equinix's Asia-Pacific Network Operation Centre with Internet exchange points access to one of the world's three GRX peering points.
NN milesInterested in this information?Contact us ProInterested in this information?Contact us
NN milesInterested in this information?Contact us Keppel DC Singapore 5 (Kingsland)
Kingsland Data Center was completed in Singapore in Q3 2015. The 208,000ft2, 5-storey purpose-built data center facility has 30MVA of redundant power supported by two diverse sub-stations.
NN milesInterested in this information?Contact us Tower ProInterested in this information?Contact us
NN milesInterested in this information?Contact us NeutraDC: Telin-3
Telin-3, a purposed built 5-storey multi-tier data centre and telecommunication hub is strategically located in the Singapore Data Centre Park (Tanjong Kling).
NN milesInterested in this information?Contact us Equinix Singapore SG5
SG5 is a nine-story facility located at the Tanjong Kling data center park. At full buildout, it will offer 5,000 cabinets, with a total colocation space of close to 129,000 square feet (12,000 square meters).
NN milesInterested in this information?Contact us UltraInterested in this information?Contact us
NN milesInterested in this information?Contact us Plaza GammaInterested in this information?Contact us
Mapletree Sunview 1 is a six-storey build-to-suit (“BTS”) data centre with a gross floor area of about 242,000 square feet.

Operating Company

Operated by:

Amazon Web Services (AWS) is a subsidiary of Amazon.com that provides on-demand cloud computing platforms to individuals, companies and governments, on a paid subscription basis.

0
Facilities
0
Markets

News See all

Read AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus
Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land D...

AWS Files 36-Building Data Center Plan at 4.5GW Homer City Campus

October 07, 2026 Amazon AWS

Amazon Web Services has formally signed on to the largest gas-powered data center project in the United States. Amazon Data Services, Inc., the company's development arm, filed a Preliminary Land Development Plan with the Indiana County planning commission on August 28 under the project name...

Read more
Read AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania
Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussin...

AWS Proposes 36-Building Data Center Campus in Indiana County, Pennsylvania

October 07, 2026 Amazon AWS

Amazon Web Services (AWS) has filed plans for a 36-building data center campus at the Homer City Energy Campus in Pennsylvania. AWS first revealed its interest in the area in August while discussing potential development with Homer City Redevelopment. The proposed campus will span 1,100 acres...

Read more
Read AWS Receives Planning Approval for Data Center in Iver, UK
Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industri...

AWS Receives Planning Approval for Data Center in Iver, UK

October 01, 2026 Amazon AWS

Amazon Web Services (AWS) has received planning approval for a new data center project in Iver, Buckinghamshire, UK. Buckinghamshire Council approved the development, which will replace 17 industrial and warehouse units with a data center featuring 27 backup generators. Planning officers...

Read more
Read Generac Secures $8bn Backup Generator Deal With Amazon
Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. ...

Generac Secures $8bn Backup Generator Deal With Amazon

September 26, 2026 Amazon AWS

Generac has signed a long-term deal to supply backup generators to Amazon’s data centers. The agreement includes about $2.4 billion in deliveries over two years and could reach $8 billion overall. Amazon will also have the option to buy nearly 1.7 million Generac shares. “It provides visibility...

Read more
Read Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio
Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joi...

Prysmian, Rio Tinto To Supply Low-Carbon Aluminum For Amazon Data Center In Ohio

September 21, 2026 Amazon AWS

Italian cable manufacturer Prysmian and mining company Rio Tinto will supply an Amazon data center in Ohio with low-carbon aluminum electrical cables. The aluminum will be produced by Elysis, a joint venture between Rio Tinto and Alcoa. Its smelting process uses proprietary inert anodes instead...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?